References

MV Future diesel electric
Pre-engineering and
feasibility study
  • single line diagram
  • load Balance
  • system set up
  • making building specification
  • functional description
  • budget calculation
  • selecting main components and materials
  • system interfacing
  • checking in system integraton on technical details
  • checking on demarcation
Status of the project:
Completed 100%
Refit PLC system Ethereal
All control and alarming on the
sailing yard
  • PLC system
  • single line diagram 
  • selecting main components and materials
  • system interfacing 
  • component list
  • detail electrical drawings
  • connection diagrams
 
 
  
 
Status of the project:
Completed 100%
rijkswaterstaat mpv-30
project management outfitting and commissioning
Rijkswaterstaat-Scheldestroom-Merwstroom-Waddenstroom-AMW-MARINE-978x550
  • project management outfitting and commisioning
  • yard support hybrid system
 
 
 
 
  
 
 
 
 
Status of the project:
Completed 100%
y
Moonpool Trolleys
serving underwater measuring equipment
  • system setup
  • functional description
  • selection of materials
  • system interfacing
  • cable routing
  • checking demarcation and scope
Status of the project:
Completed 100%
Ship design and engineering
Multi purpose /
heavy cargo vessel
  • single line diagrams
  • load balance (with DP2 requirements)
  • cable tray drawings (DP2)
  • lighting calculations
 
 
Status of the project:
Completed 100%
Ship design and engineering
For new
project
  • single line diagrams
  • load balance
  • inquiry specification (electrical)
 
 
 
Status of the project:
Completed 100%
electric propulsion 800vdc
Electrical propulsion & distribution (800VDC)
  • PLC system
  • selecting main components and materials
  • system interfacing
  • component list
  • detail electrical drawings


Status of the project:
Completed 100%
electric propulsion 800vdc
Electrical propulsion & distribution (800VDC)
  • PLC system
  • selecting main components and materials
  • system interfacing
  • component list
  • detail electrical drawings
 
 
Status of the project:
Completed 100%
refit foftein
refit & optimization
engine room installation
  • electrical generation, propulsion and distribution (800VDC)
  • refit engine room PLC system
  • selecting main components and materials
  • system interfacing
  • component list
  • detail electrical drawings
Status of the project:
Completed 100%
Interested in our services?